“Arada” launches the third phase of the “Massar” project in Sharjah

Sharjah: “Bay”
Arada recently started the community of Robinia, the third phase of Massar’s residence; The modern luxury destination in the green nature of Sharjah, in response to the growing demand of investors for spacious, nature-inspired houses, which are distinguished for their high quality. The launch of these 565 residential units, villas and villas in Robinia, was offered after the sale of the first two residential phases of the project.
The total value of the Masar project is 8 billion dirhams and includes 4,000 houses within eight closed communities connected by a central green axis that includes 50,000 trees. Masar has received widespread positive responses. The project has become the best-selling off-plan project since its inception in January 2021 in Sharjah.
Accommodation options in Robinia range from two-bedroom villas to luxury five-bedroom villas and these homes have been carefully designed to offer its residents an integrated, affluent and contemporary lifestyle. The green surroundings of the houses and the exceptional sports and leisure environments encourage a healthy and active lifestyle. The residential units are equipped with standard smart home technologies, including access control, temperature and lighting in order to provide maximum comfort for the residents, while the villas in this modern community have more privacy, additional halls, spacious balconies and wonderful swimming. swimming pool. All Robinia units are scheduled to be completed by the second quarter of 2024.
Opening of the Visitor Center
Ahmed Al-Khushaibi, CEO of Arada Group, said: “The Masar project has attracted the interest of many buyers and investors from different nationalities thanks to its unique design, strategic location and high quality homes that add value to its owners. . Therefore, we have the pleasure of launching sales of the third phase, Robinia, in this luxury residential community with a focus on raising health and sustainability concepts for families who value living in modern vibrant communities that offer their residents the highest standards of quality. within natural environments with a range of exceptional service facilities. ”
Al Khushaibi added: “We are ready to open the Masar Visitor Center and the surrounding area in June, in order to provide an opportunity for everyone to see what such an integrated community can offer, adding a taste of different and setting new standards. for modern lifestyles in the UAE. ”
network of trails
The trail is designed so that residents can enjoy a lifestyle in harmony with nature, thanks to the tree-lined paths as well as the picturesque landscape. Sports facilities scattered throughout the community include a 13 km network of continuous trails dedicated to professional runners and cyclists in a tree-lined environment.
Residents’ families will enjoy walking, walking, running, cycling and meditation within the vast green spaces that are irrigated with recycled water through a modern irrigation system designed according to the highest international standards. The community includes nine different parks with lots of different pools and sports facilities, while the entertainment district in the heart of Masari will include a shopping mall, fitness club and a range of excellent restaurants and cafés.
The Masar Visitor Center will be completed in June. So it will be the first part that will be open to the public. At the same time, a restaurant corner, a children’s play and adventure area and a skating rink will be opened, as well as an exhibition on the project.
The first Masar contracts were awarded in May last year, including the contract for the design of infrastructure, supervision and consulting services, which was won by the American engineering consultancy Parsons, and the contract for the construction of the Masar Visitor Center and Show House, which. he gave Al Shafar General Contracting. Also last March, two more contracts were awarded for infrastructure and landscape development in the central area around the Masar Visitor Center and the buffer zone surrounding the residential community.
In May, Arada awarded two large contracts worth a total of 460 million dirhams for the construction of Dushku, the first residential phase of the project. Work began immediately; Construction work is expected to be completed within 14 months. The contracts for the second and third phase of housing, Kaya and Robinia, will be contracted at the end of the third quarter of this year.
It is worth noting that the Massar community is located on the growing outskirts of Al-Suyoh, near the city of Tilal, the Greater Sharjah Mosque and the first Arada project, Nasma Residences. This modern community has easy access to Emirates Road and Maliha Road, and is just a 15-minute drive from Sharjah International Airport and 20 minutes from Dubai International Airport. The location is also characterized by the smooth movement of traffic from Sharjah to Dubai and the rest of the Northern Emirates.

Leave a Comment